2022-10-08
Ploughing @ kodipakkam
Called Jayaraman to know status of soil, rain. Not sufficient rainfall yet. Just drizzle this morning. Hope for rains today and may plough tomorrow.
Burning of thorns
Mohan confirmed most thorn were burnt yesterday. No sufficient rain
Str
77375kms o ring
Star oil change
55220
2022-10-09
Rain @ 4pm
Omandur subramani called and informed about good rain yesterday. Probably ploughing can be done in 2 days
Ploughing commences today
Jayaraman called and informed, he’ll commence ploughing today at 9am. Not much rain yesterday, not even stagnant water in kalar. Still good enough for ploughing. Will do 1 turn saal first fully, then next turn. Informed mohan and omandur subramani.
Aadhirai having Headache
Aadhirai is having headache since morning. She also had it yesterday. She had a good nights sleep. However she couldn’t study since 7am. She woke up at 5am and did her daily routine. She took one NTSE sat social paper.
First ploughing done
Jayaraman began ploughing 23-1a. Rain interrupted once he began 21-2.
1.4019ha completed I.e 3.46acre Sides are 232*50*236*70
1 turn or saal completed. My assessment is it is average as in some places, depth is too less.
Neighbors like murthy, devarjan, ramesh visited at that time.
Need to discuss with ananth mama on larger tractor impact on ploughing quality. Murthy kept talking about balaram naidu 75HP tractor . subramani has spoken to murthy earlier.
2022-10-10
6 workers and mohan working
7 workers came to work for thorn collection and removal, one got sick and gone back. Mohan is with them.
Mohan got hurt when he fell down while burning the thorn near open well at 17-2a. He got an injection as it caused a wound in hip area.
Jayaraman continues ploughing
Jayaraman has been called to continue ploughing. Mohan expressed satisfaction at yesterday’s work. Whether to continue 2nd turn or plough 21-2, will be decided by mohan and jayaraman.
Workers left @2pm
Mohan informed that Workers left @2pm. Need to give money tomorrow. Thorn removal completed at 21-2 today. Still pending at 17-2. Have asked him to plan after jcb work
Rain interruption in ploughing
Ploughing abandoned after first turn in the 21-2 southern side. Still larger stretch in the northern half is pending.
Area ploughed based on sides 68*95*80*92 is approx 6903sqm I.e 1.7acre
2022-10-11
Money transferred
₹6250 transferred to Jayaraman for ploughing done until now. 3.5+1.5 acre. 5*1250.
Remaining area is 3.55acre I.e with sides of 177*100*165*69, area is 14353sqm.
Area as per land record for 21-1, 21-2, 23-1a is 8.59 excluding 0.6 for road.
Helmet accessories
New helmet studs jade 1030, visor 190, cap 20, star lock 200, ray wire lock 250
Raincoat
Duckback 1200 rider L size
2022-10-13
Feedback from mohan on ploughing
Today while speaking to mohan about registration completion, he gave adverse feedback on the quality of ploughing. He mentioned that kozhu is not good, depth is not sufficient due to lack of power in tractor.
Registration of 15 and 21-1 completed
Registration of 15 and 21-1 completed today as exchange with Andal arumugam
2022-10-15
Babu mason visit
went to farm along with Babu Mason. He will come with estimates the next day.
Took photos of Omandur kumar field tilled by Balaram for 1 turn and our farm tilled by jayaraman. Went along with Mohan and Babu Mason. The photo can be seen here https://photos.app.goo.gl/gGhgPFCX4tfQFFXi9↗
Jayaraman called and discussed about plughing 17-2 to prevent cattle entering 17-1. I Informed Jayaram not to do anymore ploughing as the quality is not good. Also requested him to put thorns on the borders, if required. He also spoke to Omandur Subramani.
Enquired after Mohan about his hip injury. He has a monkey plaster on his right back hip. Tablets and injection have not helped a lot.
2022-10-16
Rent non payment Tenant kannan
Sent below message thru WhatsApp “Kannan, have not received rent and the date is 16 today. You are neither picking calls nor answering calls. This is not correct”
Rent and call from kannan
Kannan called and informed that his mobile display got damaged, hence could not pick up call. He transferred rent and informed.
Requested balaram to plough
Mohan and myself called balaraman to plough. He’ll check tomorrow morning and let us know.
2022-10-18
Agri service 28
Full service ettiyappan 0246401128
Document copy Name transfer application Patta/chitta/adangal/a cerificate urimai certificate
Paid 1000 to mohan
Gave 1000 to mohan. Kalyani mohan has worked for 4 days inc today.
Ploughing attempt by balaraman
Balaraman came with his 475mf tractor with 5 point plough. Due to excess wetness, could not plough. He will try if there is sufficient gap for land to dry.
2022-10-25
3rd turn 5 Tyne ploughing completed
3rd turn 5 Tyne ploughing completed today. 17-2a, 23-1b, southern portion of 21-2 looks lumpy.
Balaraman is suggesting a rotavator after 4th turn followed by cultivator, disc for varappu and finally another rotavator.
Mohan did 4 turns 5 Tyne, cultivator, rotavator for his land.
First two turns were completed for the entire land except 15 on 23rd night around 9pm. Have paid only diesel money.
Siva nursery
Went to Siva nursery at katrpampakkam. Clonal varieties cost 1.8 and 2.3 for speed. He gets saplings from outside.
He has a plant suitable for live fence, name unknown costing ₹10. It grows by simple cutting.
2022-10-26
4th turn with rigid 5 Tyne plough completed
4th turn with rigid 5 Tyne plough completed by 12:30pm. Based on discussion with balaraman, it was decided to run cultivator today itself.
1st turn cultivator completed
1st turn cultivator started around 6pm. Requested Balaraman to form bunds with disc plough tomorrow. Balaraman suggested 2nd turn tomorrow morning so soil gets broken further immediately followed by disc.
8.5 acres were completed in less than 2 hours
Root removal from fields
Mohan accompanied driver and found that a lot of roots have come up causing cultivator to get stuck frequently. Tomorrow he’ll get 5 ladies to remove such roots from entire field.
2022-10-29
calculation for Ploughing done by Balaraman.
Done the calculation for Ploughing done by Balaraman. 4 sal 5 Tyne 11.5*1400*4 = 64400 2 sal cultivator 11.5*1400 = 16100 (Need to confirm) 1 sal Rotavator 11.5* = 17250 (Need to confirm) Total 97750 Total paid only
2022-10-27 * Tractor_BalaramanDiesel at Tindivanam with Mohan 3400 INR 35440 INR
2022-10-27 * Tractor_Balaramansri jayam motors - as per Balaraman 5000 INR 32040 INR
2022-10-26 * Tractor_balaramanpayment at National Automobiles 1240 INR 27040 INR
2022-10-25 * tractor_balaramandiesel money morning 17:30 Hrs 7000 INR 25800 INR
2022-10-25 * tractor_balaramandiesel money morning 7am 7000 INR 18800 INR
2022-10-23 * Tractor_BalaramanDiesel at Saraswati Agencies for balaraman Tractor 6800 INR 11800 INR
2022-10-18 * tractor_balaramanploughing charges adv 5000 INR 5000 INR
need to settle the money tomorrow morning
2022-10-30
Balaraman payment done
Per acre cost 5tyne 2*2800 = 5600 Cultivator 1*1600 = 1600 Rotavator 1* 2000 = 2000 Total 9200*11.5=105800 Less adv paid 35440 Remaining settled ₹70360 today
For bund formation smaller ones 300~400 Longer ones up to 700. 2 disc following rotavator to fix unleveled land.
Motor fixing charge spent by mohan
Raja 1100 Helpers 600 Tractor yet to give 500 Material 385 Raja 2000. 1000 yet to give Pipe for sand filter 450 Pooja items 50 Mohan 1100 Tiffin 115 Balance is 300 from 5000 Yet to give 1800 to mohan and 500 to jayaraman
November
2022-11-01
Romvijay Biotech
Today met Dr Vaithilingam at Romvijay biotech. He suggested silica based powder application of tripaze on the saplings. So bought 30kg@₹3600 and hand by mohan on 36000 saplings in 500trays each with 72.
He also suggested further application at every six months.
He also gave his book.
kannan@aruvapakkam nursery
Transferred ₹6000 to G.pay.no.7639710404 Rangasami as per his message and further ₹30000 to his account.
Total payment is 102,750 36000*1.8 = 64800 and 3300*11.5 = 37,950. Transport is ₹3000.
Total of 46000 transferred already. Remaining payment is 56,750 + transport I.e ₹59,750.
2022-11-02
Planting of casuarina
Planting of casuarina has been completed by Thiruvamoor jaganathan for 8.5 acres @3300. Remaining 3 will be done tomorrow morning. He was introduced by kodipakkam prem and aruvapakkam nursery kannan.
The work suffered largely due to thorns in the field and slightly by rain. There were 17 ladies, driver and supervisor.
We engaged prem to assist for food etc, kumaran and maala for transporting 125 trays. Mohan spent entire day here since 5am
2022-11-03
Casuarina planted
Casuarina planted in 3 acres west of stream at 17-2 today. Jagannathan team came at 3pm and left at 5:45pm.
Called and thanked Balaraman. Informal omandur Subramani.
Thanked aruvapakkam kannan. Yet to pay.
Shadenet 300m bought
Shadenet was bought for 300m along with nylon tope to tie. ₹800 per 50m for 1.5m width. 3m width is ₹1500. This is 50% shade
2022-11-04
Fencing work commenced
Fencing work commenced with Mohan working with Guna and Ezhumalai, who earlier helped in moving the pipes.
Completed 200m at EOD. Delay was due to stick cutting.
Rainfall status
Yesterday night there was mild rainfall and 17-2 planting is safe as of now. Heavy flood in the stream usually overflows on 17-2.
Since bunds were not formed due to rain and my decision, water from heavy rains will go waste.
Casuarina Final payment
Spoke to Aruvapakkam nursery Kannan and confirmed that final payment is ₹59,750. He will send a sapling owner’s gpay ID later, so I send above amount to him.
He did not pay anything extra as transport to Jagannathan. They were OK and happy about the way they were treated here.
Kannan on fence work
Kannan also suggested 2 person can easily finish 300m in one day. He even suggests 2 can do this.
He’ll also pay a visit and give his feedback to Mohan on the work. Nylon wire must run at the bottom continuously to prevent goats.
List of saplings
Requested kannan for list of saplings and cost from his nursery source.
Pipeline updates
Spoke to prasanth about laying pipeline in January. He suggested doing it early, as soil will be easy to work.
Spoke to Ananth mama about conversation with prasanth. Seems like prasanth earlier called ananth mama.
Casuarina contract planting
Mama also mentioned about contract casuarina planting by parties from mandagapet who will form manual bunds suitable for flood irrigation at around ₹4*** per acre along with planting. I’m curious as to why omandur Subramani did not mention about this mandagapet parties.
Money with mohan 2000
Kumaran & maala 300+150 Tea & biscuit 120+125 Water 120 Prabu 500
Balance is 685 + 1315 Paid 2300
2022-11-07
Jain drip
Quality enterprises jain drip class2 ₹11.75 per meter.
No work at farm
Mohan called and informed that no work today due to illness of worker family.
2022-11-08
Fencing completed
Fencing work with shadenet and thorns completed today. Total nine man days*600 with bf100, lunch 150/180 etc. Need to stop this tea business.
Teak sticks planting
Teak sticks bought at kooteripattu were planted at 23-1a eastern roadside border at 4.5’ intervals right in the middle of casuarina saplings. Almost 180 should have been completed.
2022-11-09
Teak planting completed
Planting of teak completed. To pay 450 in total. Mohan has 100 balance. To pay 350 more
2022-11-10
Visit to kiliyanur, molasur
Vamban 8 ₹75 after subsidy available at agri Extension center kiliyanur. 9787407497 Nagarajan
Panjanathan can be found in tc koot road. Spoke to him. He asked to apply for subsidy for Drip Irrigation drip for Blackgram as the casuarina saplings are still small.
Paid ₹350 to Mohan.
Met Ramanadhan at molasur.
Casuarina sapling status
Went through Westland and western portion of Eastland. Saplings look greenish and probably many have survived.
Mohan suggested replacing the dead ones. Suggested him to wait until first weeding. Machine Weeding can be done only after soil become dry.
Land west of 17-2 being planted with casuarina
Land west of 17-2 being planted with casuarina. First ploughing done today. He intends to plant speed saplings in January.
2022-11-12
Rain updates
Spoke to mohan and understood that water flows in midland survey no 15 at knee level. He has no idea about the status of 17. I asked him not to venture that side for safety reason.
Sporadic stagnant Water in the eastern lands. Wherever the barren soil is there, water is stagnant there. Not much of concern otherwise.
Heavy rain both yesterday and early morning today. On pause since morning. Mohan can see clouds in the north indicating rain. Weather predicted to rain tonight, tomorrow and end by Monday. To resume around 19th.
2022-11-13
Farm visit
Visited the farm during rain this morning. Found water flowing to the brim in the omandur odai and knee deep water in kovadi odai.
Found 17 not yet submerged. Next heavy rain may flood. Found water overflowing in 15 from omandur odai. Cleaning up the odai of all trees and obstacles is an important task for next year.
Discussed with mohan on rice cultivation.
In Eastern land, the northern diaganol bordering tailor land is navadai kalar and it looks so different with all the water.
Spoke to santosh, apk ilangovan
Spoke to santosh. Seems like water is draining in streets quickly in koothapakkam.
Spoke to ilangovan in aruppukottai. He’s looking for alliance for his elder son. Younger is working in HCl.
His wife works in eye dept of GH. He is still manager at Honda showroom.
2022-11-14
Drip irrigation scheme
Spoke to Panchanathan and submitted all relevant documents to him. Got adangal from VAO Radha.
Informed mohan.
Siva from Netafim called back based on web query and later villupuram manager Sampath spoke.
Arranged for site survey tomorrow along with document submission. Requested for 0.6*0.6
2022-11-15
Farmer Jo kiliyanur
Farmer Jo kiliyanur keeps a lot of agricultural implement.AO panchanathan referred him. To meet at the earliest.
2022-11-17
Sedai uzhavu
Prem started at 7:10 am. Finished 1 saal for all three thundu + 2 saal for thundu1 at 10:30am Started round 2 at 11:35 for 2saal of thundu 3. Ended at 12:15 Total time 4hrs. Not fully satisfied, mainly due to the driver performance.
Spoke to Ananth mama and he confirmed that the timing is normal for karambu.
He suggested keeping water for atleast 2 days for the plants to die
2022-11-18
Netafim and krishnapuram visit
Centralized valve
Pumping line second sub-line
Size head assembly 6’*15'
10’*20'
Rk nursery
Spent over 2 hours with Ramkumar. His twin children lav/kush alias lakshman/kumaran born 2011 studying 5 at sriram school.
He suggested the following: Remove casuarina from pipeline saal. Furrows are better for casuarina. Drip doesn’t last more than 3 years due to clog and rats.
For water logged areas naaval, sapotta,guava are suitable. For bunds coconut at 10f interval is best
2022-11-19
Prem
3470 mechanic.
Netsurf
Cheyaar vasu brand
2022-11-21
TVs star tyre
Rear 3.00*18-6 ply rating Front 2.75*18-4 ply rating
Star puncture
12-13 must 18-19 wrench set Cutting player Screw driver 14-15 16-17
Prem 1st weeding final payment
3420+30+4000+2000+7000+50
Old shed dimensions
Inner 13’*7'3"
2022-11-22
Visit to ganapthypattu
Visited farmer Sivaperumal at Ganapathy Pattu. He is watermelon trader and farmer. He was digging trench for netafim drip using JCB. 2.5’ for mainline and 1.75’ to 2’ for submain from where laterals are to be tapped.
Netafim has agreed to lay the entire pipeline at their cost.
2022-11-23
Pipeline trench work jcb Jayaraman
Spoken to jayaraman about the depth and time. He reconfirmed that he’ll do the work at ₹200 per length. His only requirement is soil to become dry.
2022-11-24
Dead saplings replacement
Dead casuarina saplings replacement carried out. 4 laborers ₹175 only 3 hours
2022-11-25
Pump house
Cement sheet 2*1, 3*1 395/595 Kalai sheet 8*3 500 2.5mm 10*3 630 Sq pipe 1*1 1.6mm/ 2mm ,7kg/9kg 81 585 per length Rect pipe 1.5*0.75 1.6mm ,9kg Bricks sakthi aruvapakkam 21/31 6"/8"*16"+1+1 Transport ₹1000. Brick ₹9200 Kalai Sheet 5*630 ₹3150 Cement sheet ₹4000 GI pipe 1" 5*6*₹150 @₹4500 or 1.25" ₹200@₹6000 Labor ₹12000,1500,1800 food ₹1500 total MSand 4300 Cement 7*450@₹3150 Others 5000
Total ₹43000
1.5"*3/4" Pipe
Dead casuarina saplings replacement
Dead casuarina saplings replacement continues. 6 labor.
Jcb receipt
Received receipt from jayaram with the following Vehicle number Signature 2 nos
Seed price
Vbn8 75 37 Vgt Kco51 50kg bag 1500 90days 1.25acre
2022-11-26
Pump house construction
Brick and MSand reached site today. Gave adv for saaram to mason. Asked venkatesan to bring along cement 7 bags.
Vamban8 and gingelley
6kg per acre, 2 pack rhizobium per acre. Monday is auspicious. Suggested gingelley 2 bag complex spic, if no then fact elephant, if not vijay per acre Gingelley 2kg + 10kg sand for entire 11 acre
Pump house estimate
Finished
Bricks sakthi aruvapakkam 21/31 6"/8"*16" ₹8200 MSand 3100 Transport 2000+labour1800+food ₹700 Adv ₹1500 Labor ₹200 Total as on date: ₹17,500
Pending Cement sheet 2*1, 3*1 395/595 Sq pipe 1*1 1.6mm/ 2mm ,7kg/9kg 81 585 per length Rect pipe 1.5*0.75 1.6mm ,9kg +1+1
Estimates Kalai Sheet 5*630 ₹3150 Cement sheet ₹4000 GI pipe 1" 5*6*₹150 @₹4500 or 1.25" ₹200@₹6000 Labor ₹12000 food ₹1500 Cement 7*450@₹3150 Door 40kg*₹130 5200 Others 5000 transport
Total ₹35000
1.5"*3/4" Pipe
Ignored
Kalai sheet 8*3 500 2.5mm 10*3 630
2022-11-27
Paddy seed sowbaghya bought
Mohan bought 14kg paddy seed sowbaghya at gowtham tindivanam. ₹1400.
2022-11-28
ADT 37 bought
ADT 47 50kg bought
Pump house construction
Salary 3200 Tea 50 Petrol 50
- Natrangal ploughed
2022-11-29
Fertilizer recommendations from Subramani
Spic 4 50g bag 14:28:14 Fact
Kodur 15kms from renukunta
Pump house
Cement sheet 2*1, 3*1 395/595 each 5 sheet 5*495@2475. 5*595@2975. Total ₹5450 Gi pipe 40mm 1.6mm 6nos 67.3kg*110@7403 Others ₹627 bolt, thar washer 127 J clamp 500
2" pipe 6 length Bolt 6 No’s Clamp set Cuddapaah stone 4*1 + 5*1.5. 540
Door ₹1940 Paint Keel
718 1/2 coil or 25m 450 1sqmm coil 1000 Fuse Box 450+100+450 fuse Pipe 200+180 Bulb 200
Shakeel roofing 13480 Raj hardwares 2268 Vetrivel electrical 3800+40 Cudappah stone 540 Manjula hotel 300 Tea 25+12+50 Tata ace 900 Air 10 Bread 38 Vojay Complex 20:20:0 7kg ₹170 Labor 2200
2022-11-30
Fallow land subsidy items
Liquid fertilizer 4 bottles 10kg
December
2022-12-06
Zinc sulphate to change soil
Panchanathan suggested to apply 10kg zinc sulphate per acre to make paddy field from pulichu pothal.
2022-12-09
Aakash digital www.aakash.learn.in↗
2022-12-09
Paddy nutrients
Nov 30 karthikai 14 paddy seedlings down. Today a mix of urea and energy plus ,each 60ml was mixed with 12l and sprayed.
2022-12-20
Weeding updates
Machine weeding commenced on 2022-12-17. Blackgram sowing commenced together with machine weeding from 17-2a. Machine weeding continued for 4th day today. Today land from middle of open well to tailor land was weeded for 2turns.
Manual weeding for 17-2a was completed by 11 ladies led by Subrayalu’s wife. Bought 2nos juice bottles and ₹5 biscuit packet. Salary ₹200.
Nirmal friend Boopathy urged his parents & relatives to come for weeding today. Need to thank him.
This weeding is supposed to help blackgram growth.
Rain may appear only on Thursday.
Subrayalu acct nunber
55105793
2022-12-23
Mini Tractor Weeding payment
9 hrs 8 hrs 6.25 9.5 3.5 10 8 Total hours 54.25*750 @40687
Less 7k diesel and 5k payment. Balance 28687
2022-12-27
No farm visit
Did not visit farm today due to rain. Finished aadhar and idli podi .
Selvan and mohan called and updated about sufficient rains at the field. All seeds should have sufficient water for the next 15 days
Paddy transplantation
Mohan on consulting with omandur Subramani, decided on 2jan for transplantation of paddy. Sedai, kalasam to be done before that
2022-12-28
Nutrient for blackgram
70 litre water 30kg urea +10kg urea
17-22 das
Dap 4kg + 1kg urea (overnight) +1kg potash at spray time per acre
Zinc sulphate +dap 3+1 bag
20kg
Panchanathan advice paddy
1.5 bag urea 20kg zinc sulphate₹41 per kg during nadavu kiliyanur. Rest after 10 days
Instead of spic dap, use factomfos 2 bag+1bag urea+1 bag potash + 15 kg micro nutrients for paddy
Seed farm 200 per acre.
2022-12-31
Paddy updates
Today somu completed 2nd sedai for all three land parcels. Third one was done 3 saal, others 2 saal.
Parambu ottuthal completed only for 1.5 land parcels. Seems like the bull feels frightened by the uneven soil and quicksand like behavior.
Tomorrow kalasam kattuthal or plucking of saplings from nursery will take place. Six are expected and will start at 6am
Today Mohan mixed algae with zinc sulphate and sand applied in the three land parcels. Apparently I should be more careful about his ability to understand.
During transplantation, he’ll apply urea+complex. Next application of urea+potash after 15 days. Then no more nutrients.
2023
January
2023-01-01
Blackgram Fertilizer recommendations
Ramesh from murugan & co fertilizer shop recommended all 19 liquid fertilizer from coramandal ₹150 per pack(usual price₹180) to spray at the rate of 50g/ml per tank. In total we need 4.5kg. 8 tank per acre 30 DAS.
Since irrigation is must for above dose, he suggested reduced dose of 30 ml per tank and to be applied during dew time.
We should include 1/2 bottle per acre to the above fertilizer.
Pest management
Ramesh also suggested alternative to furidon Cipel or ferret or fury nacl. 1kg per acre₹800 per pack
Paddy Transplantation
Paddy Transplantation plucking completed today with 5 people working from 7:30 to 4:30pm at 7*₹600 salary with bf, lunch etc
Workers had a tough time plucking saplings from areas where water drainage was not done properly.
Parambu by Anbalagan could not be completed as the bulls refused to walk due to their fear of quicksand. Some
1245mudichu I.e 60*20 from IR39 and 260 from sowbaghya variety. 800 mudichu per acre is needed.
Gps
12°10'01"N 79°42'26"E • 23 m. Neem tree
2023-01-02
Paddy transplantation updates
Paddy transplantation completed. Instead of agreed 25, workers demanded payment for 27. Spent 500 for transport and 1000 for food. Workers started at 10am and finished by 1:30pm
Settu helped mohan to distribute paddy sepling kalasam across the main field and spread nutrients 2bag complex faramfos 20:20:0:13 and 1bag urea and 6 packs of furidon. He retained 15kg for chilli.
Bought crackers to ward off naraai and kokku. Naarai seems to be very brave and doesn’t fear human sounds.
2023-01-05
Coromandel fertilizer
Foliar spray 19:19:19 12:61:0
Plano Fix
2023-01-07
Foliar spray
Today planned to do 10 tanks 100litre
500gm MAP 12:61:0 500 ml energy plus 225ml urea
1225ml stuff + 1275ml water 10*250= 2500ml Each of ten tank one 250ml cup of mix
2023-01-08
Spray count
5 Yesterday 1.5 Skipped one ,row 1.5 tank 1 map+ urea only 1 energy plus only 4 combined+2 Total 14.5 only in west area
2023-01-10
Animal sounds
https://youtu.be/jC-3xeCXkrI↗ https://youtu.be/QKtgO1U2FBI↗ https://youtu.be/0sRz71VsBNo↗ https://youtu.be/Gg__4OUOa9g↗ https://youtu.be/BzM-K7agIpo↗ https://youtu.be/Cm-LyRgTYe0↗
2023-01-18
Paddy Fertilizer
2 bags of MOP@3400, 2 bag urea@580, 1bag DAP@1300 purchased. DAP for blackgram foliar spray and rest for paddy and chilli
February
2023-02-07
WiFi calling Note 6 Pro
Follow the instructions below to activate
Step 1 If WiFi calling is not enabled or does not show then type ( * # * # 869 434 # * # *) in dialer You will see vowifi carrier check disabled, this means your phone supports it, if you don’t see this, older Redmi phones such as Redmi 4 etc don’t have Vo-Wifi
Step 2 Switch off WiFi and ensure data is connected Open a random webpage This is so that your phone is imprinted on the network
Step 3 Go into airplane Turn on WiFi It should work now
If it doesn’t work, then go to the dialer and type ( * # * # 4636 # * # *) in the dialer Here go to phone information, scroll down and there you will see what is enabled and what isn’t The switch for ‘Mobile Phone Power’ or something something power as it may differ phone to phone. It should be the first switch
Turn it On. Go back and back and now WiFi Calling will work.
NOTE This switch is notorious for turning off by itself. So if WiFi calling doesn’t work by default, check in the phone services
In my case I have to do Step 2, 3 & enable mobile power every time I want Vo-Wifi. It’s ok, it’s worthwhile to be on WiFi Calling.
Source: https://www.quora.com/How-do-I-enable-WiFi-calling-on-Redmi-mobiles↗
2023-02-12
cracked heels
Cracked heels are a common problem among Ladies.. Yup Foot care is not a difficult One to follow. Regular foot care with simple home remedies can easily prevent cracked heels. For this,, We Can Use Alum(Padikaram in Tamil) powder.
Its one of the Very Effective Natural Remedies towards Curing Cracked Heels.. Alum has been used since years for its wonderful Benefits. You can find this stone Quite easily in the Market. It is also called Shaving Alum in the shops.
What you Need..
Same Piece of Alum or You Can directly Use Alum Powder + Coconut Oil (As Needed)
Note - You can also Use Olive Oil Instead of Coconut Oil..
Procedure
Heat the Broken Piece of Alum in a thick bottomed pan.
Shortly, Alum will Melt and Start Foaming. Finally It will form into a Crumbly Mixture.
Allow it to Cool and Powder it finely..
At last Mix it with coconut oil and Apply on the Cracked Heels.
Regular Usage gives you an Instant and amazing good relief.. 
Another One: Mix 1 tsp of Alum Powder + 1/2 tsp of Lemon + 1/2 tsp of Glycerin and Apply. This is also an effective natural tip. TC!! 
http://www.penmai.com/forums/hand-foot-nail-care/91049-padikaram-cracked-heels.htm↗
Mix 1tsp Vaseline and lemon Juice. Rub this mixture Nicely over your heels. Its one of the Best Remedies for Cracked heels.
Another Effective Remedy is,,
Simply Soak your feet in warm water for 10 minutes. Then Mix 2 tbsps of ground rice,few drops of honey & apple cider vinegar to make a thick paste. Apply this over your heel & Gently rub it. It helps to remove dead skin from your feet.
2023-02-22
Motor start 12:30 Off 14:30
2023-02-23
Blackgram harvest
Harvest began this morning. Until 10:30 only ten rows of 60m were completed by 8 ladies.start time 8am 10:30 to 11:17 60m completed
2023-02-27
2" 562 2.5" 786 3" 1129
March
2023-03-22
Today sesame plants winnowing has to be done.
Association will not act against any resident or nonresident. No executive or resident can use association name or its services or facilities to act against another individual.
April
2023-04-24 Monday
- This is a test message
- Second test message
- This is the third message for today
- 4 th message
5th message
5th message for the day
2023-04-27 Thursday
This is an update using command org-roam-dailies-goto-today.
Test capture
This is using command org roam dailies capture today
Finally it works
After fixing the org mode version mismatch, finally the function my-capture with shortcut C-c c, which calls using org-roam-dailies-capture-today works
2023-04-28 Friday
Testing further org mode loading
Now i’ll test with disabling org-mode load command.
Unable to download stable version of org-mode
unable to locate stable version of org-mode anywhere. so will stick with this bleeding version
Test Hydra
calling capturing notes using Hydra is tested here.
Making progress with org-roam manual
Finally making some progress with org-roam manual. Only bibtex is pending.
demo to Aadhirai
This entry is made to show the dailies function to Aadhirai using org-roam
Gtd bibtex
@book{gtd, added-at = {2008-06-27T11:45:34.000+0200}, author = {Allen, David}, biburl = { https://www.bibsonomy.org/bibtex/2faa6b0ddb1484a552f99eef6ad77889f/cschenk↗ }, description = {The methodology is great but needs to be tailored to ones specific needs - I felt like I wasn’t one from the audience Allen wrote this book for.}, interhash = {4f54d8c8802c230664da91d651f12a8e}, intrahash = {faa6b0ddb1484a552f99eef6ad77889f}, keywords = {art book done getting gtd personal-development productivity rating:4 read:2007 stress-free things}, month = {January}, note = {ISBN-10: 0142000280 ISBN-13: 978-0142000281}, publisher = {Penguin}, timestamp = {2008-06-27T11:47:13.000+0200}, title = {Getting Things Done. The Art of Stress-Free Productivity}, url = { http://www.davidco.com/↗ }, year = 2003 }
May
2023-05-02 Tuesday
Testing the context
Added the code :Context: %a\n%? based on https://honnef.co/articles/my-org-roam-workflows-for-taking-notes-and-writing-articles/↗ to ensure that after capturing the fleeting note, control goes back to the orginal place.
daily capture seems to work well
daily capture seems to work well as any time i press C-c c, immediately the capture window appears and on saving or killing, the control goes back to earlier buffer.
- Need to clean up journal history before this template was introduced.
Test message to see how daily_journal changes
Test message to see how daily_journal changes when the option for datatree changed from week to month.
- another test with datatree as day
checking timestamp
Just tested C-c . command to insert timestamp
2023-05-03 Wednesday
use-package features
https://systemcrafters.net/live-streams/september-24-2021/↗ features that use-package provides:
:ensure - Install package :after - Load after another package :init - Run code before package loads :config - Run code after package loads :custom - Set custom variables with concise syntax :defer - Defer loading until some later point :demand - Ensure loading at startup :bind - Bind keys for modes :hook - Set hooks that will cause package to load :commands - Set autoloaded commands that will cause packag to load :mode - Activate mode when particular file types are opened
Difference in commands?
Seems like C-c c works on starting emacs i.e from scratch buffer. however C-c n f does not work there.
- Test for changing format of datetree from day to date
Test code
seems like chaning to date does not make any difference.
Org-roam-dailies navigation with custom template
https://emacs.stackexchange.com/questions/71328/org-roam-dailies-navigation-with-custom-template↗
More testing
everything works for now. No more testing for now.
templates is still wip
templates in org-roam is still a wip
2023-05-04 Thursday
Heavy rain on 2023-05-03 night
Seems like there was very heavy rain on 2023-05-03 night. Today Omandur Subramani and Kovadi Mohan called and informed about the heavy rains. Uncle informed that heavy rain started at 10pm itself. The previous night it drizzled for the entire night. Mohan confirmed that the Omandur canal is running to the brim and the openwell has risen dramatically. Seems like we can survive this summer.
2023-05-05 Friday
Ploughing rates from Balaraman
Spoke to Balaraman. He confirmed that the rates for 2-disc plough and 5 point rigid tyne are 5k and 3k respectively per acre. Need to make a decision quickly on what to use. May need to plough atleast 7 acres.
customize hydra-!
I’m trying to customize hydra that i downloaded from steckemacs website.
2023-05-06 Saturday
**
testing hydra
The hydra for navigation is being tested here..
2023-05-08 Monday
3i investor meet link
2023-05-09 Tuesday
cpu comparison
H510M-E 6050 Pentium G6400 4600 (saw an offer in flipkart) Total - 10650 PCIe 4.0 Display port 2 USB3 ports Windows 11 4MB cache 2Core 4 Thread TDP: 58 W
A320M-K 5100 Ryzen3 3200G 7000 Total - 12100 PCIe 3.0 4 USB3 ports windows 10 6MB cache 4Core 4 Thread TDP: 65W
cpu comparison(update)
H510M-E 5900 Pentium G6405 4109 (saw an offer in flipkart) Total - 10009 PCIe 4.0 Mbd Display port 2 USB3 ports Windows 11 4MB cache 2Core 4 Thread TDP: 58W DDR4 - 2633MHz
A320M-K 5100 Ryzen3 3200G 7000 Total - 12100 PCIe 3.0 4 USB3 ports windows 10 6MB cache 4Core 4 Thread TDP: 65W DDR4-2933MHz
2026
2026-02 February
2026-02-07 Saturday
Another day of testing Journal entries after updating the init.el file.
2026-05 May
2026-05-09 Saturday
Journaling again
This is another attempt to start using the journal. Today did another round of cleaning up the init.el and fixed Youtube-dl and Audio Video Editing in Linux documents.
Aniruth fry cooked Anchovy - nethili. He bought half a kg and it turned out be good.
Made some minor changes in Org Roam for journaling. Added some reading material links.
Fixed baseof.html in hugo_server site, so that the text content is properly centred on the page.
2026-05-10 Sunday
Moved emacs configuration to org file
Today moved the emacs configuration file to org mode file . Documented the migration steps too. Updated the formatting for few pages.
2026-05-12 Tuesday
Moved navigation menu from sidebar to top
Spent multiple hours on getting the navigation menu bar from left sidebar to top. The move was simpler. However, getting the geometry correct took much longer. My knowledge is still not good enough to do these things without help of claude/gemini.